Konsultan Engineer Power Study

Rp. 123
*Price Excludes Value Added Tax
Last Updated
19 Feb 2025
Minimum Order
1 unit

Engineering and Service

Design and Consultancy

Feasibility Studies

  • Electrical Designs and Specifications for Electrical Power Networks from 11KV to 150KV
  • Electrical Connections and Infrastructure for Renewable Generation Schemes

Technical Services

Substation and Powerplant Condition Assessments and Surveys

Building Services

Design/Specifications and Project Management for Commercial and Industrial Installation

  • Lightning Protection Systems

Earthing Design and Transient Analysis

Electrical Interference Studies with other services

  • Design/Re-Design of Substation Earthing Systems (11KV to 400KV)
  • Earthing System Modeling
  • Design of Earthing /Lightning Protection /LV Supplies for Aerial Installations on Transmission Towers
  • Lightning Protection Schemes
  • Fast Transient Analysis Studies
  • Insulation Co-Order

Power Quality

  • Quality of Supply and Fixed Plant Assessments and Advice
  • Harmonic Measurement Analysis
  • Flicker Measurement and Analysis
  • TRANSIENT DISTURANBANCE MEASUREMENT AND ANALYSIS


Protection

Protection Scheme Design and Specification for Generation, Transmission and Distribution Systems

Power System Analysis

Full Range of Power System Analysis Studies (Load Flow, Short Circuit, Harmonic, Protection Co-Order, Dynamic Stability)

& nbsp;

Project Reference

& nbsp;

Show More

Untuk keterangan lebih lanjut, silahkan download PDF ini :

Request a Quote
Produk Siap di Pesan
Rp 0
1

no

Customer

Project

Description & nbsp; of scope

1

PT DSS Karawang 1

Power System Study

  • Load Flow Studies to Asses Equipment Rating and Loading, Voltage Profile, Losses etc.
  • & nbsp;

    & nbsp;

    PT. DSS Karawang 1 (Member of App-Sinar Mas Group) is Coal Power Plant which Supply Electricity to Pindo Deli (Paper Mills Plant) Around 30MW, Syncronizing between Power Plants and PLN To Be Done Through Power Transformer 3 X 50MVA, 70/20KV < /P>

    & nbsp;

    & nbsp;

  • Fault Level Studies to, Short Circuit Current Levels and Flows to Assess Equipment Capabilities and Undertake Protection Co-Order Studies.
  • Protection Studies to Determine Protective Device Settings to Achieve Coordination
  • Transient stability and load sheeding studies to assess system responses to events such as fault disturbances, generation trips / start up etc.
  • Harmonic Studies to Asses Harmonic Distortion Levels and Penetration and Effectiveness of Any Potential Mitigation Measures
  • 2

    Rimau Electric

    Power System Study

  • Load Flow Studies to Asses Equipment Rating and Loading, Voltage Profile, Losses etc.
  • & nbsp;

    & nbsp;

    PT. Rimau Electric is Owner of Coal Power Plant at Tamiyang Central Kalimantan which supply electricity to PLN 2 x 3.5mw, synchronizing with PLN at 20kv Feeder

  • Fault Level Studies to, Short Circuit Current Levels and Flows to Assess Equipment Capabilities and Undertake Protection Co-Order Studies.
  • Protection Studies to Determine Protective Device Settings to Achieve Coordination
  • 3

    PT Indokomas Buana Perkasa

    Power System Study

  • Load Flow Studies to Asses Equipment Rating and Loading, Voltage Profile, Losses etc.
  • & nbsp;

    & nbsp;

    PT. Indokomas is a contractor of coal power plant 2 x 7mw at Berau East Kalimantan which supplying electricity to PLN, synchronizing with PLN at 20kv

  • Fault Level Studies to, Short Circuit Current Levels and Flows to Assess Equipment Capabilities and Undertake Protection Co-Order Studies.
  • Protection Studies to Determine Protective Device Settings to Achieve Coordination
  • 4

    PT Arena Maju Bersama

    Power System Study

  • Load Flow Studies to Asses Equipment Rating and Loading, Voltage Profile, Losses etc.
  • & nbsp;

    & nbsp;

    PT Arena Is Owner of Coal Bed Methane Genset Power Plant 10 x 700kw at Tayan-West Kalimantan Which Supply Electricity to PLN, & Nbsp; synchronizing with pln at 20kv

  • Fault Level Studies to, Short Circuit Current Levels and Flows to Assess Equipment Capabilities and Undertake Protection Co-Order Studies.
  • Protection Studies to Determine Protective Device Settings to Achieve Coordination
  • 5

    PT Bayu Bumi Gemilang

    Power System Study

  • Load Flow Studies to Asses Equipment Rating and Loading, Voltage Profile, Losses etc.
  • & nbsp; & nbsp;

    PT. Bayu Bumi Gemilang is owner of gas engine power plant which supply electricity to PLN and Industrial Customer at Belimbing Bontang, 4 x 2MW, & nbsp; synchronizing with pln at 20kv

  • Protection Studies to Determine Protective Device Settings to Achieve Coordination
  • Transient stability and load sheeding studies to assess system responses to events such as fault disturbances, generation trips / start up etc.
  • 6

    PT Bayu Bumi Gemilang

    Power System Study

  • Load Flow Studies to Asses Equipment Rating and Loading, Voltage Profile, Losses etc.
  • & nbsp;

    & nbsp;

    PT. Bayu Bumi Gemilang is an owner of gas engine power plant which supply electricity to industrial customer at Gresik, 4 x 2MW, & nbsp; synchronizing with pln at 20kv feeder

  • Fault Level Studies to, Short Circuit Current Levels and Flows to Assess Equipment Capabilities and Undertake Protection Co-Order Studies.
  • Power Quality Investigation, Including Measurement and Analysis of Harmonic Distortion, Voltage Flicker, & Nbsp; Voltage Dip; Demand (Real, Reactive, PF etc); transient short circuit.
  • 7

    PT Garuda Maintenance Facility

    Power System Study

  • Power Quality Investigation, Including Measurement and Analysis of Harmonic Distortion, Voltage Flicker, & Nbsp; Voltage Dip; Demand (Real, Reactive, PF etc); transient short circuit.
  • & nbsp;

    & nbsp;

    PT Garuda Indonesia Facility is the owner of maintenance facility is the owner of maintenance of the air plane at Cengkareng Soekarno Hatta Airport, the Distribution System Using Medium Voltage System 20kv from PLN

  • Assessment, Design and Specification of Remedial Measure to Improve Power Quality, Transient Performance etc.
  • 8

    PT Hasta Prajatama

    Power System Study

  • Load Flow Studies to Asses Equipment Rating and Loading, Voltage Profile, Losses etc.
  • & nbsp;

    & nbsp;

    PT. Hasta Prajatama is Contractor of MyCrohydro Powerplant 3 x 3MW at Cilaki 2 West & Nbsp; Java which supply electricity to PLN, & nbsp; synchronizing with pln at 20kv feeder

  • Fault Level Studies to, Short Circuit Current Levels and Flows to Assess Equipment Capabilities and Undertake Protection Co-Order Studies.
  • Protection Studies to Determine Protective Device Settings to Achieve Coordination
  • 9

    PT Bina Guna Kimia

    Power System Study

  • Load Flow Studies to Asses Equipment Rating and Loading, Voltage Profile, Losses etc.
  • & nbsp;

    & nbsp;

    PT. Bina Guna Kimia (FMC Group) is owner of fertilize plant at Semarang Central Java, The Plant Distribution System (1MVA) Using Medium Voltage System 20KV from PLN, and Low Voltage 400V System

  • Fault Level Studies to, Short Circuit Current Levels and Flows to Assess Equipment Capabilities and Undertake Protection Co-Order Studies.
  • Protection Studies to Determine Protective Device Settings to Achieve Coordination
  • Power Quality Investigation, Including Measurement and Analysis of Harmonic Distortion, Voltage Flicker, & Nbsp; Voltage Dip; Demand (Real, Reactive, PF etc); transient short circuit.
  • Assessment, Design and Specification of Remedial Measure to Improve Power Quality, Transient Performance etc.
  • Measurement of the Local Soil Resistivite Caracteristic for Substation and Generation Protection
  • Design and Specification of Generation and Substation Earthing System to Meet Electrical and Lightning Protection System Requirement and Produce Safe Step and Touch Potential
  • Measurement of Impedance of Installed Earthing System
  • 10

    PT INDO KORSA

    Power System Study

  • Load Flow Studies to Asses Equipment Rating and Loading, Voltage Profile, Losses etc.
  • Fault Level Studies to, Short Circuit Current Levels and Flows to Assess Equipment Capabilities and Undertake Protection Co-Order Studies.
  • & nbsp;

    & nbsp;

    PT INDO KORSA IS OWNER OF TIRE PLANT AT CITEREUP WEST JAVA, THE PLANT DISTRIBUTION SYSTEM (20MVA) USING MEIUM VOLTAGE

  • Motor Starting Studies
  • 11

    PT Asuka Engineering Indonesia

    Power System Study

  • Load Flow Studies to Asses Equipment Rating and Loading, Voltage Profile, Losses etc.
  • & nbsp; & nbsp;

    PT. Hasta Prajatama is Contractor of Oxygen Plant at Cilegon West Java Which Have Power Distribution Around 40MVA, Using 11KV and 400V Power Distribution

  • Fault Level Studies to, Short Circuit Current Levels and Flows to Assess Equipment Capabilities and Undertake Protection Co-Order Studies.
  • Protection Studies to Determine Protective Device Settings to Achieve Coordination
  • Motor Starting Studies
  • 12

    AKUO ENERGY INDONESIA

    Power System Study

  • Load Flow Studies to Asses Equipment Rating and Loading, Voltage Profile, Losses etc.
  • & nbsp;

    & nbsp;

    Akuo Energy Indonesia as a leading company in renewable energy technology industry is planning to interconnect its generated electricity from the solar pv power plant to the national grid (PLN).

  • Fault Level Studies to, Short Circuit Current Levels and Flows to Assess Equipment Capabilities and Undertake Protection Co-Order Studies.
  • Protection Studies to Determine Protective Device Settings to Achieve Coordination
  • Transient stability and load sheeding studies to assess system responses to events such as fault disturbances, generation trips / start up etc.
  • 13

    PT Asuka Engineering Indonesia

    Power System Study

  • Load Flow Studies to Asses Equipment Rating and Loading, Voltage Profile, Losses etc.
  • & nbsp;

    & nbsp;

    Power Assessment in PT Cargill Serang Plant

  • Fault Level Studies to, Short Circuit Current Levels and Flows to Assess Equipment Capabilities and Undertake Protection Co-Order Studies.
  • 14

    SUVEIYOR INDONESIA

    Power System Study

  • Grounding Grid Study
  • & nbsp;

    & nbsp;

    PT Antam 2 x 30 MW CFPP Antam Pomalaa

    & nbsp;

    15

    PT Asuka Engineering Indonesia

    PT HOLCIM

    Testing and Calibration Protection Relay and KWH meter

    16

    PT INDUSTIRA

    PLTMH Cirompang

    Design and Manufacturing Neutral Grounding Transformers

    17

    PT Indokomas Buana Perkasa

    PLTU Berau

    Design and Manufacturing Neutral Grounding Transformers

    18

    PT Cyma Engineering Indonesia

    & nbsp;

    LV Main Distribution and Lighting Panel

    19

    Sinohydro

    PLTA Jatigede

    Manufacture Lighting Pole and Transmission Pole Installation

    20

    PT NAVITAS

    & nbsp;

    Design and Manufacturing Neutral Grounding Resistor

    21

    PT. Sinar Bahana Mulya

    Citra Grend Ciputra Group

    Installation of cable cable cable and cable supply

    22

    PT. Indonesian Main Electrindo

    Siemens

    Power Study and Relay Coordination Report

    23

    PT. BBRI

    PT. BBRI

    Maintenane MCC, Switchgear and Motor

    24

    PT. SEF TECHNO

    PT. SEF TECHNO

    MAINTENANCE MAGNETBLAST BREAKER

    25

    PT. Wijaya Karya

    Power System Study

    & nbsp;

    26

    PT.Anena Maju Bersama

    & nbsp;

    PLTGB TAYAN KALIMANTAN BARAT 9 X 1000 KVA

    & nbsp;

    Outgoing MV 20 KV Switchgear

    Incoming MV 20 KV Switchgear

    PT Bus MV 20 KV Switchgear

    Oux Travo 20 KV Switchgear

    LV Switchgear Interface

    LV Switchgear

    Main Distribution

    Battery and Charger Panel 24 VDC

    Lighting Panel

    NGR 20 KV Outdoor

    KWH Panel

    Installation, Testing and Commissioning

    27

    PT. Crimau Electric

    & nbsp;

    PLTU Tamiyang 2 x 3 MW

    & nbsp;

    Metal Clad Out Going 20kv

    Metal Clad Incoming 20kv

    KWH Panel

    Battery and Charger

    Lighting Panel

    NGR

    Installation, Testing and Commissioning

    NGR

    Installation, Testing and Commissioning

    28

    PT.ZUG INDUSTRY

    & nbsp;

    PLTU Tamiyang 2 x 3 MW

    & nbsp;

    Generator Control Panel 2 x 350 KVA

    LV Switchgear

    Testing and Commissioning (20KV, 6.6 KV SWGR) Consist of 12 Switchgear

    Installation, Testing and Commissioning

    29

    PT. Andys Kencana

    & nbsp;

    Unibraw Senate Building

    & nbsp;

    Ligning Protection

    Distribution Board

    Fire Alarm

    CCTV

    Lighting Panel

    Installation, and Commisoning

    30

    PT. Zug Industry

    & nbsp;

    Sangau PLTU 2 x 7MW

    & nbsp;

    Fire Alarm

    Installation and Commisoning

    31

    PT. DSS Karawang 1

    & nbsp;

    Power Study and Maintenance Service

    & nbsp;

    PT. DSS

    PLTU 30MW

    Power Study

    Transient stability and load sheeding

    Service Relay Protection & amp; Circuit Breaker